Construction Process Business Model Strategy to Fulfil the Working Contract at PT Uniteda Arkato
##plugins.themes.bootstrap3.article.main##
This study aims to (1) analyze the appropriate business model at PT. Uniteda Arkato, (2) To analyze how to increase the production of stockpiling dams to achieve the target of the work contract, (3) To analyze to determine rational production capability standards. The population in this study is the contract PT. Uniteda Arkato, totaling four contracts. Analytical method used in this research is the Canvas Business Model, Critical Path Method (CPM), and Line Balancing. The results of the study found that with the appropriate canvas business model, companies can compete with companies that have been developing for a long time, Critical Path Method (CPM) can determine critical path that exists during construction process and line balancing analysis makes the production process more efficient. From low production, there is a tendency for delays in the time agreed in the contract. As a result of this delay, the company suffers from possible loss of penalty penalties in addition to the production level that is not achieved will lead to an increase in costs, especially overhead costs.
Downloads
References
-
Alfriansyah, A. & Arianto, B. (2016). Analisa Peningkatan Kapasitas Produksi Kabel Dengan Metode Line Balancing di PT. XYZ. Program studi teknik industri, Jakarta.
Google Scholar
1
-
Amirullah (2015). Pengantar Manajemen. Jakarta: Mitra Wacana Media.
Google Scholar
2
-
Daman, A. & Nusraningrum, D. (2020). Analysis of Overall Equipment Effectiveness (OEE) On Excavator Hitachi EX2500-6. Dinasti International Journal of Education Management and Social Science,
Google Scholar
3
-
Dio Ariqsyah, Muhammad (2021). Analisis Perencanaan Penjadwalan Proyek Konstruksi dengan Mengunakan Metode Critical Path Mehod dan Critical Chain Project Management (Studi Kasus: PT Pelindo 1). Depatement Teknik Industri Universitas Sumatera Utara, Medan.
Google Scholar
4
-
Hunger, J.D. dan Wheelen, T.L. (2017). Strategic Management and Bussiness Policy: Toward Global Sustainability (13th Edition). New York: Pearson.
Google Scholar
5
-
Hambali, A. & Andarini, S. (2021). Formulasi Strategi Pengembangan Bisnis Menggunakan Pendekatan Busines Model Canvas (BMC) dan SWOT Analysis dalam Upaya Meningkatkan Daya Saing pada Piring Seng Coffee & Co Tunjangan Surabaya. Jurnal Poli Batam.
Google Scholar
6
-
Heizer, J. and Render, B. (2015), Manajemen Operasi: Manajemen Keberlangsungan dan Rantai Pasokan, edisi 11, Salemba Empat, Jakarta.
Google Scholar
7
-
Johnson, G., Scholes, K., (2016). Exploring Corporate Strategy. 8 Edition. Boston: Prentice Hall.
Google Scholar
8
-
Kartika, K., Meilina (2021). Analisis Model Bisnis Bank Muamalat Dengan Pendekatan Business Model Canvas. STIES Bekasi.
Google Scholar
9
-
Lumangkun, Larry, D.D. Masie, James, & Mandagie, Yunita (2021). Desain Model Bisnis Transjakarta Mengunakan Business Model Canvas. Jurnal EMBA, 9(3).
Google Scholar
10
-
Mughni, M. & Pusipita Sari, R. (2021). Penerapan Metode Line Balancing Untuk Efisiensi Produksi Pada Bagian Line Face Lathe (Studi Kasus: PT.XYZ). Jurnal Teknovasi, Volume 08, Nomor 02.
Google Scholar
11
-
Nusraningrum, Dewi & Priyono, Joko (2018). Analysis Of Cost Contol, Time and Quality on Constuction Project. Journal of Management and Business, 17(1).
Google Scholar
12
-
Osterwalder, A & Pigneur, Y. (2015). Business Model Generation. Jakarta: PT. Elex Media Komputindo.
Google Scholar
13
-
Osterwalder, A dan Pigneur, Y. (2017). Business Model Generation: Pedoman bagi para Visioner, Penggerak Perubahan, dan Pendobrak. Jakarta: PT. Elex Media Komputindo.
Google Scholar
14
-
Pracoyo, Tri kunawangsih dan Antyo Pracoyo (2016). Aspek Dasar Ekonomi. Jakarta: PT Gramedia Widiasarana Indonesia.
Google Scholar
15
-
Prisilia, H. (2018). Aplikasi metode Lean Project Management dalam Perencanaan Proyek Konstruksi pada Pembangunan Gedung SMU Negeri 1 Giri Kabupaten Banyuwangi. Jurnal Teknik Waktu, 16(1), ISSN:1412-1867.
Google Scholar
16
-
Ridho Hermawan, Sakti (2017). Penerapan Critical Path Method (CPM) Pada Proyek Freeze Dryer di PT. Pharos Indonesia. Universitas Mercubuana, Jakarta.
Google Scholar
17
-
Shidiq Ma’mury, Syahriel & Firmanto, Arief (2017). Analisis Kontruksi Proyek Pembangunan PT. Tempoland Cirebon. Jurnal Konstruksi, Cirebon.
Google Scholar
18
-
Sondang P. Siagian. (2016). Sistem Informasi Manajemen, Bumi Aksara. Jakarta.
Google Scholar
19
-
Sugiyono (2015). Metode Penelitian Kombinasi (Mix Methods). Bandung: Alfabeta.
Google Scholar
20
-
Sugiyono (2019). Metode Penelitian Kuantitatif, Kualitatif R&D. Bandung: Alfabeta.
Google Scholar
21
-
Sugiyono (2019). Statistika untuk Penelitian. Bandung: CV Alfabeta.
Google Scholar
22
-
Sumarni, Murti & Soeprihanto (2014). Pengantar Bisnis Dasar-Dasar Ekonomi Perusahaan, Yogyakarta: Liberty Yogyakarta.
Google Scholar
23
-
Tri Hamidah, Puput (2019). Analisis Supply Chain Management dalam Upaya Meningkatkan Produksi pada PT Londo Sumatra Indonesia, Tbk. Fakultas Ekonomi dan Bisnis UIN, Sumatera Utara.
Google Scholar
24
Most read articles by the same author(s)
-
Yudha Syaputra,
Dewi Nusraningrum,
RAM Analysis at Gas Turbine Power Plant with Six Sigma Method , European Journal of Business and Management Research: Vol. 7 No. 4 (2022) -
Dewi Nusraningrum,
The Sustainability of Competitive Strategy in the Tourism Services Industry , European Journal of Business and Management Research: Vol. 7 No. 4 (2022) -
Pristiyani Solikhah,
Dewi Nusraningrum,
Increasing Production Capacity of Oil Country Tubular Goods Pipe Using Oee Methods , European Journal of Business and Management Research: Vol. 7 No. 5 (2022) -
Teuku Riza Syahrial,
Dewi Nusraningrum,
Improving Performance and Electricity Production with the Overall Equipment Effectiveness Method as the Basis for the Proposed Application of the Total Productive Maintenance Concept on the PLTS Equipment System at Soekarno-Hatta Airport , European Journal of Business and Management Research: Vol. 7 No. 4 (2022)