Investigating How Budget Plan Contributes to Successful Implementation of Level Two Healthcare Infrastructure Projects in Kiminini Sub-County, Trans Nzoia County, Kenya
##plugins.themes.bootstrap3.article.main##
Healthcare is a critical pillar of long-term development. It is therefore up to nations and governments to ensure their healthcare systems are up to date to meet the growing needs of their populations. Developing healthcare infrastructure is critical to achieving this goal. The overall goal of this research was to investigate the influence of project planning on successful implementation of functional level two hospital infrastructure projects in Kiminini Sub-County. The specific objective was to investigate how cost and budget plan influences successful implementation of projects in Kiminini sub- County, Trans Nzoia County, Kenya. Kenya Health Policy 2014-2030 was the intervening variable. Explanatory research design that utilizes both qualitative and quantitative data collection methods was used. The target population included the County departments of health, public works, and finance, heads and staff of the sampled facilities, political and community representatives and contractors. Sample size was 100 respondents. Questionnaires and interview guides were used to collect primary data. Quantitative data was analysed using SPSS version 25. Qualitative data was analysed using content analysis method and presented in narrative form. According to study findings, while some projects were completed within budget, others failed to meet their objectives. Budget estimates and funding were planned though not all were implemented as planned due to delayed disbursement of funds and delay in approving the budgetary allocation for projects due to political differences. The study recommended better collaboration between County and National governments and County assembly, and political good will. The study concluded that planning, and cost and budget plan are crucial in implementation of successful projects. The study aimed at adding value to existing knowledge in the field of study and aiding in implementing successful healthcare infrastructure projects as envisioned in Kenya Vision 2030, and Kenya Health Policy 2014-2030.
Downloads
References
-
Abiq Business intelligence. (2020). Top Five HealthCare Projects in Africa. Retrieved from: https://www.abiq.io/2021/04/11/top-5-healthcare-projects-in-africa/.
Google Scholar
1
-
Arumugam, M. (2017). What is a Project? Retrieved from: https://www.pmdrill.com/what-is-a-project/.
Google Scholar
2
-
Bahra, A. What Causes delays and Cost overruns on major infrastructure Projects? Retrieved from: https://www.constructionproducts.org.uk/news-media-events/blog/2019/may/what-causes-delays-and-cost-overruns-on-major-infrastructure-projects/.
Google Scholar
3
-
Barclay, C., & Kweku-Muata, B. (2016). Strategic Project Management. Contemporary Issues and Strategies for Developing Economies. CRC Press.
Google Scholar
4
-
Babu, C., Oswald, A. G., & Sylvester, M. (2019). Appraising the Performance of Construction Projects during Implementation in Kenya, 1963-2018: A Literature Review Perspective. KICEM Journal of construction Engineering and Project Management, 9(2).
Google Scholar
5
-
Bhandari, P. (2021). Questionnaire Design, Methods, Question, Types, Steps. https://www.scribbr.com/methodology/questionnaire/#:~:text=A%20questionnaire%20is%20a%20list,the%20social%20and%20health%20sciences.
Google Scholar
6
-
Bwayo, P. (2020). Delays to complete building Trans Nzoia Referral Hospital Unwarranted. (June 29, 2020). https://nation.africa/kenya/counties/trans-nzoia/Trans-Nzoia-referral-hospital/3444800-3493696-format-xhtml-view-asAMP-llksx9/index.html.
Google Scholar
7
-
Calzon, B. (2022). Data Analysis Methods & Techniques. https://www.datapine.com/blog/data-analysis-methods-and-techniques/.
Google Scholar
8
-
Centre for the Theory of Change. (2023). Setting Standards for the Theory of Change. https://www.theoryofchange.org/what-is-theory-of-change/.
Google Scholar
9
-
Council of European Development Bank (CEB). (2020). Strengthening Health Care Infrastructure for All. https://coebank.org/en/donors-and-trust-funds/eu-facility-refugees-turkey/strengthening-healthcare-infrastructure-all/.
Google Scholar
10
-
County Government of Trans Nzoia. County Integrated Development Plan CIDP 2018-2022 Indicator Handbook. https://www.devolution.go.ke/wp-content/uploads/2020/02/Transnzoia-CIDP-2018-2022.pdf.
Google Scholar
11
-
Crandon, S. (2017). Sample Size: A Practical Introduction. https://s4be.cochrane.org/blog/2017/09/27/sample-size-a-practical-introduction/.
Google Scholar
12
-
Etikan, I., Musa, S. A. & Alkassim, R. S. (2016). Comparison of Convenience Sampling and Purposive Sampling. American Journal of Theoretical and Applied Statistics, 5(1).
Google Scholar
13
-
Hayes, A. (2021). Simple Random Sample. https://www.investopedia.com/terms/s/simple-random-sample.asp.
Google Scholar
14
-
INTRAC. (2017). Theory of Change. https://www.intrac.org/wpcms/wp-content/uploads/2017/01/Theory-of-Change.pdf.
Google Scholar
15
-
Irfan, K., Hassan, N., Hassan, M., Habib, M., Khan, S., & Khan, H. H. (2021). Role of Project Planning and Project Manager Competencies on Public Sector Project Success. Sustainability, 13(3), 1421. https://doi.org/10.3390/su13031421.
Google Scholar
16
-
Kenya National Bureau of Statistics (2019). Kenya Population and Housing Census: Volume 1. https://housingfinanceafrica.org/app/uploads/VOLUME-I-KPHC-2019.pdf.
Google Scholar
17
-
King, M. E., & Manu, R. (2020). Government Project Failure in Developing Countries: A Review with Particular Reference to Nigeria. Global Journal of Social Sciences, 19, 35-47.
Google Scholar
18
-
KMPG, Australian Institute of Project Management (2019). The Future of Project Management: Global Outlook 2019. Retrieved from: https://www.ipma.world/assets/PM-Survey-FullReport-2019-FINAL.pdf.
Google Scholar
19
-
Kusters, C., Batjes, K., Wigboldus, S., Jan, B., & Baguma, S. D. (2017). Managing for Sustainable Development Impact. Wageningen University & Research. https://www.ircwash.org/sites/default/files/2017-kusters-managing-for-sustainable-development-impact.pdf.
Google Scholar
20
-
Masaba, B. B., Moturi, J. K., Taiswa, J., & Mmusi-Phetoe, R. M. (2020). Devolution in Kenya: Progress and Challenges. Public Health, 189, 135-140.
Google Scholar
21
-
Megan, K. (2022). What is Stakeholder Theory? https://www.projectmanager.com/blog/what-is-stakeholder-theory.
Google Scholar
22
-
Middleton, F. (2019). Reliability and Validity in Research/ Differences, Types and Examples. https://www.scribbr.com/methodology/reliability-vs-validity/#:~:text=Reliability%20and%20validity%20are%20concepts,the%20accuracy%20of%20a%20measure.
Google Scholar
23
-
Mirembe, C. & Otieno, M. (2019). Influence of Monitoring and Evaluation Strategies on Performance of County Government Funded Projects; A Case of Trans Nzoia County Government, Kenya. International Journal of Novel Research in Humanity and Social Sciences, 6(6), 67-95.
Google Scholar
24
-
Moses, M. W., Korir, J., Zeng, W., Musiega, A., Oyasi, J., Lu, R., Chuma, J., & Di Giorgio, L. (2021). Performance assessment of the county Healthcare systems in Kenya: A Mixed-methods Analysis. BMJ global health, 6(6).
Google Scholar
25
-
Muchiri, T. M., Grace, W., & Patrick, S. (2021). Influence of Funding Activities on Completion of Selected County Funded Construction Projects in Kitale Town, Trans Nzoia County, Kenya. Saudi Journal of Engineering and Technology, 63, 45-52.
Google Scholar
26
-
Mukami. T.M. (2019). Socio Economic Factors Influencing Completion of Selected County Funded Construction Projects in Kitale Town. http://erepository.uonbi.ac.ke/bitstream/handle/11295/152819/Mukami_Socio%20Economic%20Factors%20Influencing%20Completion%20Of%20Selected%20County%20Funded%20Construction%20Projects%20In%20Kitale%20Town,%20Trans%20Nzoia%20County,%20Kenya.pdf?sequence=1.
Google Scholar
27
-
Muriithi, S.H., Makokha, E., & Otieno, C. (2017). Factors affecting timely completion of public construction projects in Trans Nzoia County. International Journal of Scientific and Research Publications, 7(4), 404-434. http://www.ijsrp.org/research-paper-0417/ijsrp-p6459.pdf.
Google Scholar
28
-
Tabu, N. (Producer). (2021, December 18). Republic Devolved: Taking Stock of the Decentralization of government, 9 Years on. (Citizen Tv Episode). https://www.youtube.com/watch?v=hyq1N10IDbg.
Google Scholar
29
-
O’Brian, J. & Orn, A. (2018). Validity vs. Reliability. The Basics of Validity and Reliability in Research. https://research-collective.com/validity-reliability/.
Google Scholar
30
-
Oeri, K. J., & Nyaberi, D. (2020). Completion of Public Construction Projects in Trans Nzoia County, Kenya. International Journal of Research in Commerce Economics and Management (IJRRCEM), 7(1), 208-229.
Google Scholar
31
-
Project Management Institute. (2017). Guide to the Project Management Body of Knowledge (PMBOK), (6th Ed.) Project Management Institute, Inc., U.S.A.
Google Scholar
32
-
Project Management Institute, Pulse of the Profession. (2020). Research Highlights by Region and Industry. Retrieved from: https://www.pmi.org/-/media/pmi/documents/public/pdf/learning/thought-leadership/pulse/pulse-all-comparison-reports-final.pdf?v=dd7afb39-1fe0-4063-923f-11410463244d.
Google Scholar
33
-
Project Management Institute, Pulse of the Profession. (2017). Success Rates Rise Transforming the High Cost of Low Performance. Retrieved from: https://www.pmi.org/-/media/pmi/documents/public/pdf/learning/thought-leadership/pulse/pulse-of-the-profession-2017.pdf.
Google Scholar
34
-
Project Management Institute, Pulse of the Profession (2021). Sub-Saharan Africa. Retrieved from: https://www.pmi.org/-/media/pmi/documents/public/pdf/learning/thought-leadership/pulse/pulse2021_regional_sub-saharan-africa_final.pdf?v=3875ac8b-4a38-4e9d-b497-9302f9013b19&sc_lang_temp=en.
Google Scholar
35
-
Republic of Kenya. (2010). The Constitution of Kenya 2010.
Google Scholar
36
-
Selina, W. & Willy, M. (2017). Factors Influencing Completion of County Government Funded Projects in Trans-Nzoia County. International Journal of Management and Commerce Innovations, 4(2), 74-83.
Google Scholar
37
-
Tiluk, S. & Mokaya, N. (2021). Effects of Stakeholders Engagement on the Implementation of Physical Infrastructure Projects in Public Secondary Schools: A Case of West Pokot and Trans Nzoia Counties, Kenya. Asian Journal of Education and Social Studies, 25(4): 1-10, 2021. https://journalajess.com/index.php/AJESS/article/download/486/971/769.
Google Scholar
38
-
Trans Nzoia County Annual Development Plan 2019-2020. https://repository.kippra.or.ke/bitstream/handle/123456789/816/2019-2020%20Trans%20Nzoia%20County%20ADP.pdf?sequence=1&isAllowed=y.
Google Scholar
39
-
Trans Nzoia County Annual Development Plan 2020-2021. https://www.transnzoia.go.ke/wp-content/uploads/2019/09/revised-trans-nzoia-county-annual-development-pla-adp-2020-2021.pdf.
Google Scholar
40
-
United Nations. (2015). Sustainable Development. Goal 3: Ensure Healthy Lives and Promote Well-Being for all at all ages. https://sdgs.un.org/goals/goal3.
Google Scholar
41
-
Voxco. (2021). Exploratory Research vs Explanatory Research. Retrieved from: https://www.voxco.com/blog/exploratory-research-vs-explanatory-research/.
Google Scholar
42
-
Watt, A. Project Management; Budget Planning. Retrieved from: https://opentextbc.ca/projectmanagement/chapter/chapter-12-budget-planning-project-management/.
Google Scholar
43
-
Werner, R. T. D. (2007). Project Governance – Phases and Life Cycle. PhD Student Radboud University of Nijmegen, The Netherlands. https://www.mnmk.ro/documents/2007/2007-24.pdf.
Google Scholar
44
-
Wilson, M. (2021). What is Pragmatism. Retrieved from: https://www.restaurantnorman.com/what-is-a-simple-definition-of-pragmatism/.
Google Scholar
45